MX75 Cross Flow Cooling Tower Film Fill Pvc Black 1520 Mm
Product Details:
Place of Origin: | Jiangsu, China |
Brand Name: | XL |
Certification: | SGS |
Model Number: | XL-1220-MA |
Payment & Shipping Terms:
Minimum Order Quantity: | 10 square meters |
---|---|
Price: | $1.2-2/square meters |
Packaging Details: | Wooden,cartons,custom package |
Delivery Time: | 10 working days |
Payment Terms: | Western Union, T/T, MoneyGram, D/P, D/A, L/C |
Supply Ability: | 1000m2/per pay |
Detail Information |
|||
Circulation: | 206mm*N | Material: | PVC,PP,CPVC |
---|---|---|---|
Warranty: | 1 Year | Name: | MX75 Cross Flow Cooling Tower Film Fill, Pvc Cooling Tower Material, Black Cooling Tower Media |
Width: | 750/820/920/1020/1220/1520mm | Wave Height: | 19-20mm |
Usage: | Cooing Tower | MOQ: | 10 Square Meters |
Thickness: | 0.32-0.6mm | ||
Highlight: | Cross Flow Cooling Tower Film Fill,MX75 Cooling Tower Fill Material,1520 mm Cooling Tower Film Fill |
Product Description
MX75 Cross Flow Cooling Tower Film Fill, pvc Cooling Tower Material, Black Cooling Tower Media
Description:
Hanging type cooling tower fills description:
When doing installation, sheet A and sheet B(male and female) are assembled one after another with industrial glue. Sheet solid by adjoining all cones on the fill sheets to create an interference fit, thus attaching the loose sheets together into module. Then the assembled block will be hung into the cooling tower.
Flute spacing significantly affects fill performance; smaller spacing increases the surface area but also raises the potentialseverity of fouling.
Specifications:
Tech Date | |
Sheet Width(mm) | 760/820/920/1020/1220/1420/1530-1510mm |
Sheet Length | 206MM*N(N=4,5,6,7,8,9,10,11,12......)/customized |
Thickness | 0.32-0.6mm/customized |
Sheet Spacing | 19-20mm |
Color | grey/white/black |
Material | PP/PVC/CPVC |
Related Cooling Tower Film Fill

Cleaning Cooling Tower Tips
Cooling tower packing cleaning method:
1. Manual cleaning of the slag falling off in the cooling tower;
2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;
3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;
4. After confirming that all parts of the system are cleaned, drain the sewage;
5. Rinse the packing and the inside and outside of the tower body with clean water;
6. Restore all parts of the system, replenish water and use it;
7. After all recovery, please check and accept the management personnel of Party A;
8. Evacuate Party B's belongings and clean the site;
PACKING AND DELIVERY