• 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts
  • 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts
  • 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts
  • 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts
  • 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts
  • 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts
1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts

Product Details:

Place of Origin: Jiangsu, China
Brand Name: XL
Certification: SGS
Model Number: XL-1000-SP

Payment & Shipping Terms:

Minimum Order Quantity: 10 square meters
Price: $1.2-2/square meters
Packaging Details: Wooden,cartons,custom package
Delivery Time: 10 working days
Payment Terms: Western Union, T/T, MoneyGram, D/P, D/A, L/C
Supply Ability: 1000m2/per pay
Get Best Price Contact Now

Detail Information

Condition: New Cooling Type: Cooling Tower Parts
Material: PVC,PP,CPVC Warranty: 1 Year
Name: 1000*1000mm Cooling Tower Pvc Sheet FillerCooling Tower PVC Film Fill For Packaged Cooling Towers Width: 850/1000mm
Height: 1000mm Usage: Cooing Tower
MOQ: 10 Square Meters Thickness: 0.32-0.6mm
Wave Height: 16mm
High Light:

cooling tower fill material price xianglong

,

1000mm Cooling Tower Fill Material xianglong

,

850/1000mm Cooling Tower Parts xianglong

Product Description

1000*1000mm Cooling Tower Pvc Sheet FillerCooling Tower PVC Film Fill for Packaged Cooling Towers

 

 

Description:

 

Cooling Tower Fill provides sheets of material that are shaped into a corrugated pattern for the water to travel across. It can be combined and stacked into blocks, to create various thicknesses and heights to fit individual cooling towers.

The largest disadvantage of film fill is that it doesn’t provide an opportunity for the water to redistribute itself. The initial water distribution at the top of the fill must be uniform, or the process won’t work well. The close spacing created by the narrow passages of film fill also makes film fill more challenging to maintain. If the water includes large debris like leaves, the fill is prone to clogging.


Specifications:

Tech Date

 

Sheet Width(mm)

850/1000mm

Sheet Length

1000mmcustomized

Thickness

0.32-0.6mm/customized

Sheet Spacing

16mm

Color

grey/white/black

Material

PP/PVC/CPVC

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 11000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 2

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 3

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 4

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 5

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 4

Cooling Tower Fill Operating of Principle

*Cooling towers reject heat from water-cooled systems to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.

 

*There are two main configurations of factory assembled cooling towers: crossflow and counterflow. In crossflow cooling towers, the water flows vertically down the fill as air flows horizontally across. In counterflow cooling towers, the water flows vertically down the fill as air flows vertically up.

 

Related Cooling Tower Film Fill

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 7

 

Supply in industry

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 8

 

Cooling tower packing cleaning method:

 

1. Manual cleaning of the slag falling off in the cooling tower;

 

2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;

 

3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;

 

4. After confirming that all parts of the system are cleaned, drain the sewage;

 

5. Rinse the packing and the inside and outside of the tower body with clean water;

 

6. Restore all parts of the system, replenish water and use it;

 

7. After all recovery, please check and accept the management personnel of Party A;

 

8. Evacuate Party B's belongings and clean the site;

 

PACKING AND DELIVERY

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 9

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 10

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 11

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 12

 

About US

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 13

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 14

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 15

 

1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 16

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.


If you have other questions, please feel free to contact us as below:

 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts 17

 

Want to Know more details about this product
I am interested in 1000X1000mm Cooling Tower Fill Material 850/1000mm Cooling Tower Parts could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.